- DP Drillships and Semi-submersibles including dual activity rigs
- Moored semi-submersibles
- Jack-ups, platforms and land rigs
- Deepwater and ultra-deepwater exploration and
development in up to 8900ft water depth
- HPHT drilling operations engineering and management
- Ultra-HPHT conceptual design and feasibility study (up to 30,000psi BHP)
- Subsea completions in up to 6300ft water depth
- SIMOPs studies and optimisation
- Remote locations; offshore and onshore including areas with severe security problems
- Workover operations including Hydraulic Workover Unit (HWO) operations
- Full-field development concept engineering including rig design both onshore and offshore in up to 8200ft water depth
- New basin exploration entry feasibility studies
- New-build ultra-deepwater rig commissioning and acceptance
- Rig market analysis
- Horizontal wells
- Carbonate and H2S drilling
- Highly environmentally sensitive locations, onshore and offshore
- Underbalanced drilling
- Salt cavern gas storage